8-26-25 Short Notice – Olympic Adventure Trail – MP 11 -Bear Creek Bridge replacement

Short notice for equestrians on the Olympic Adventure Trail. The Bear creek bridge(s) replacement will close this section of the OAT (mile 11~mile 11.75) to equestrians and other stock starting on Wednesday, 27Aug. Hope to have the bridges restored by 30Sept. There is not a safe stock crossing with the bridge(s) removed for rebuild. We’ll let everyone know when a safe crossing for equestrians is available again. There is enough room at the closure points to turn stock around.

Trail runners, hikers and mountain bikers will have a temporary crossing point, but cyclists should plan to dismount to cross safely.